Scroll Top

development projects

CONTAINER TERMINAL
1

The container terminal was built and opened in 2011. The total storage space of the terminal is 38 000 m² and the capacity is 60 000 TEU. The depth of the draft is 13.80 m and the length of the pier is 280m.

The terminal is equipped with two mobile cranes as well as an STS crane.

Further development plans for this terminal are:
1
  • extension of the existing pier length to 330 m
  • increase storage space up to 25 ha